SURCHARGES


Bunker (New Adjusted for Slow Steaming)
(Effective 1.1.12 through 3.31.12)

US$

538 per 40' container (WC)
1059 per 40' container (EC/Gulf)

(Please refer to table on Surcharge Calculators page for other equipment sizes)



Bunker (Previous)
(Effective 1.1.12 through 3.31.12)

US$

568 per 40' container (WC)
1107 per 40' container (EC/Gulf)

(Please refer to table in Bunker Fact Sheet for other equipment sizes)


 

Inland Fuel (effective 1.1.12 through 3.31.12)



US$

353 for rail/intermodal

177 for RIPI

102 for Group 4/EC local SDD truck

 


Currency (effective 10.1.11 through 12.31.11)



Japan

23%

 

CHARGES


 

Alameda Corridor Charge
(Effective 1.1.12)
                     


US$

22 per 20' container
43 per 40' container
43 per 40' HC container
49 per 45' container

     
     


^ Top