SURCHARGES


Bunker
(Effective 7.1.14 through 9.30.14)


US$


516* per 40' container (WC/Group 4)
990* per 40' container (EC&Gulf/RIPI)
885** per 40' container (WC Intermodal)

*Includes Low-Sulfur Component posted below.

**Includes Low-Sulfur and Intermodal Components posted below.



Low-Sulfur Component
(effective 7.1.14 through 9.30.14)


US$


20 per 40' container (WC)
21 per 40' container (EC/Gulf)


 

Intermodal Fuel Surcharge (IFS) Component
(effective 7.1.14 through 9.30.14)




US$


369 per 40' container



Currency
(effective 7.1.14 through 9.30.14)




Japan


10%

 

CHARGES


 

Alameda Corridor Charge

                     


US$

23 per 20' container
45 per 40' standard/HC container
51 per 45' container

     
     


^ Top